CONSOLIDATED ABADDON RESOURCES INC. : http://www.consolidatedabaddon.com/ : QwikReport

News Releases

#Wed Jun 2, 2010
Dave Busch Changes Role in Consolidated Abaddon

 Vancouver, BC -- Consolidated Abaddon Resources (TSX-V: ABN) announces that Dave Busch has changed his role in the Company from that of Vice-President of Exploration to Consulting Geologist.

About Consolidated Abaddon Resources Inc.:

Consolidated Abaddon Resources is a lithium, rare earth and uranium exploration company developing properties in northern Ontario and the Athabasca Basin of northern Saskatchewan.

For further information on Consolidated Abaddon Resources Inc. (TSX-V: ABN), visit our Company's web site at www.consolidatedabaddon.com.

ON BEHALF OF THE BOARD OF DIRECTORS

"Jim Pettit"
____________________________
JAMES G. PETTIT
President

For further information contact myself or:
Don Myers
Consolidated Abaddon Resources Inc.
Director
Telephone: 604-687-3376
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@consolidatedabaddon.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.
 
#Wed Apr 14, 2010
Consolidated Abaddon Drills 9 Metres 1.3% Lithium at Raleigh Lake Lithium and Rare Earth Project

 Vancouver, BC - Consolidated Abaddon Resources Inc. (TSX-V: ABN) (FWB: E2L) (the "Company") has completed a seven hole, 1464 metre, diamond drilling program at its Raleigh Lake Lithium (Li) and Rare Earth Elements (REE) property located in the Kenora Mining Division in northwestern Ontario.

Raleigh Lake Lithium project location map:
http://www.consolidatedabaddon.com/s/Image.asp?i=maps/Ignace.jpg

Assaying (SGS Laboratories) was done by completing a 55 element suite of minerals. Significant results from the phase one drilling include 9.0 metres of 1.30% Li in hole RL10-2, 4.7 metres of 0.84% Li in hole RL10-1 including 2.2 metres of 1.10% Li and 1.0 metre of 1.33% Li, 5.5 metres of 0.77% Li in hole RL10-3, 9.6 metres of 0.48% Li in hole RL10-5, and 5.7 metres of 0.48% Li in hole RL10-6.

President Jim Pettit stated: "We are encouraged and very pleased with the results from our initial drill program as they have confirmed and expanded the known lithium and REE zone on the property. Combining these results with Avalon's earlier drill results gives us a much clearer understanding of the regional geology and the emplacement of rare earth elements. We look forward to the second phase work program."

Phase One Drill Hole Summary Table
Hole No	 From m	 To m	Length m    % Lithium	% Rubidium    Tantalum ppm
RL10-1	  28.3	 33.0     4.7	       0.84	   0.26	           -
incl	  29.8	 32.0     2.2	       1.10	     -             -
	  29.3	 33.8	  4.5	         -	     -	          130
	 154.3	161.0	  6.7	       0.53	     -	           -
incl	 159.0	160.0     1.0	       1.33	     -             -
	 216.8	219.5	  2.7	       0.51	     -	           -
RL10-2	  84.0	 93.0     9.0	       1.30	   0.18            -
RL10-3	 103.5	109.0     5.5	       0.77	     -             -
	 102.5	113.0	 10.5	        -	   0.21	           -
	 104.0	112.5	  8.5	        -	     -	          200
RL10-4	  77.7	78.75	 1.05	        -	   0.28	           -
	 185.0	186.8	  1.8	       0.57	     -	           -
	184.25	186.8	 2.55	        -	   0.35	          100
RL10-5	  24.4	 34.0     9.6	       0.48	   0.20	          162
RL10-6	 112.2	115.8	  3.6	       0.24	   0.17	          100
	 123.0	128.7     5.7	       0.48	   0.18	          100
RL10-7	 107.3	108.9	  1.6	         -	     -	          900

The phase one drill program was highly successful in confirming and expanding the known lithium and REE mineralization at the property. Pegmatite bodies were intercepted in all seven holes with several pegmatites of 10 to 11 metre thickness being found. The wall rocks to the pegmatites consist of a sequence of mafic volcanics and gabbroic intrusive bodies. These wall rocks are locally sheared, sericite altered and mineralized with pyrite, rhyolite and chalcopyrite. The majority of the intersected pegmatites bodies are rich in spodumene. Spodumene is a lithium bearing silicate mineral and is a common lithium ore mineral in pegmatite mines worldwide.

Only a few shallow holes were drilled on the Raleigh Lake property by the previous owner, Avalon Ventures Ltd., in 1999 and 2000. Historic data available in the Ontario Government geological files reflect certain significant intersections below.

Hole # RL 99-01 0.56 % Li over 3.2 metres
Hole # RL 99-04 1.00 % Li over 4.1 metres
Hole # RL 99-05 1.50 % Li over 6.9 metres

A litho geochemical survey completed on the property by Consolidated Abaddon has indicated several areas where tantalum, lithium and cesium anomalies are present. These areas are in structural zones related to intrusive granites, some of which are the 'two mica' type. The structures were identified from the ground magnetic surveys and have not yet been drill tested. Further work will focus on these prospective areas.

Average lithium grades from several developing lithium projects around North America range from about 0.25% Li to 1.50% Li. Lithium is a light, highly reactive metal with use in a variety of industrial applications including ceramics, lubricants and pharmaceuticals. The fastest growing market for lithium is as lithium carbonate for use in rechargeable batteries, including those in cell phones, computers and new generations of electric and hybrid vehicles. For every one unit of lithium in a cell phone battery there are 7 in a computer battery, 3,000 in a hybrid car and 7,000 in an electric car; the numbers works out to 9 to 30 kilograms of lithium oxide per car battery. Demand for lithium destined for battery usage is predicted to grow by 20% per year.

David Busch, BA, BSc, PGeo, Vice President of Exploration, is the qualified person under the meaning of National Instrument 43-101 and has reviewed the data in this news release.

About Consolidated Abaddon Resources Inc.:

Consolidated Abaddon Resources is a lithium, rare earth and uranium exploration company developing properties in northern Ontario and the Athabasca Basin of northern Saskatchewan.

For further information on Consolidated Abaddon Resources Inc. (TSX-V: ABN), visit our Company's web site at www.consolidatedabaddon.com.

ON BEHALF OF THE BOARD OF DIRECTORS

"Jim Pettit"
____________________________
JAMES G. PETTIT
President

For further information contact myself or:
Don Myers
Consolidated Abaddon Resources Inc.
Director
Telephone: 604-687-3376
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@consolidatedabaddon.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

This news release may contain certain "Forward-Looking Statements" that may involve a number of risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. For a more detailed discussion of such risks and other factors, refer to the Company's filings with Canadian Securities regulators available on www.sedar.com.
 
#Tue Mar 9, 2010
Phase One Drill Program Completed on Raleigh Lake Lithium Project

 Vancouver, BC - Consolidated Abaddon Resources Inc. (TSX-V: ABN) (FWB: E2L) (the "Company") has completed a seven hole, 1464 metres, diamond drilling program at its Raleigh Lake Lithium property located in the Kenora Mining Division in northwestern Ontario.

Raleigh Lake Lithium project location map:
http://www.consolidatedabaddon.com/s/Image.asp?i=maps/Ignace.jpg

The phase one drill program was highly successful in confirming and expanding the known lithium mineralization at the property. Assays are now pending for cut core samples of intersected pegmatites. The assays will include lithium and a suite of rare earth minerals including tantalum and cesium. Pegmatite bodies were intercepted in all seven holes with several pegmatites in 10 to 11 metre thickness being found. The wall rocks to the pegmatites consist of a sequence of mafic volcanics and gabbroic intrusive bodies. These wall rocks are locally sheared, sericite altered and mineralized with pyrite, rhyolite and chalcopyrite. Selected wall rock zones have been sampled and will be assayed for potential gold mineralization.

The majority of the intersected pegamtites bodies are rich in spodumene. Spodumene is a lithium bearing silicate mineral and is a common lithium ore mineral in pegmatite mines worldwide. The spodumene at Raleigh Lake is light green in color, has distinctive crystal habit and is easily identified in drill core. The following table displays the pegamtite zones intersected in the drilling and identifies the qualitative degree of lithium mineralization based on spodumne content. The other targeted rare earth minerals are more difficult to identify but will be reported in the pending assays.

Raleigh Lake drill hole #2:
http://www.consolidatedabaddon.com/i/photos/DSCI0373.jpg

Drill Hole Summary Table
Hole ID	UTM Easting	UTM Northing	Depth (m)     Azimuth	Inclination
RL10-1	576639	          5473588	  227.0	        270	   50
RL10-2	576649	          5473705	  191.3		 90 
RL10-3	576772	          5473896	  191.0	        275	   65
RL10-4	576642	          5474047	  296.0		 90
RL10-5	576521	          5473875	  179.0	        275	   50
RL10-6	576460	          5473593	  221.0	        282	   50
RL10-7	576808	          5473789	  158.2		 90
		     Total Metres	 1463.5		

Pegmatite Intercept Summary Table
Hole ID	 From (m)	To (m)	Thickness (m)	    Comments	
RL10-1    29.30	         33.80	  4.50	        Spodumene Rich Pegmatite
	 117.65	        118.05	  0.40	        Spodumene Bearing Pegmatite
	 119.20	        119.70	  0.50	        Spodumene Bearing Pegmatite
         152.70	        160.55	  7.85	        Spodumene Rich Pegmatite
         216.60	        219.10	  2.50	        Spodumene Rich Pegmatite
RL10-2    83.50	         94.00	 10.50	        Spodumene Rich Pegmatite
RL10-3    97.50	        112.45	 14.95	        Spodumene Rich Pegmatite
	 150.20	        150.75	  0.55	        Spodumene Bearing Pegmatite
RL10-4   184.25	        187.60	  3.35	        Spodumene Rich Pegmatite
RL10-5	  25.40	         32.00	  6.60	        Spodumene Bearing Pegmatite
	  34.80	         35.30	  0.50	        Spodumene Bearing Pegmatite
	  36.10	         36.80	  0.70	        Spodumene Bearing Pegmatite
RL10-6	 112.20	        115.20	  3.00	        Spodumene Bearing Pegmatite
         123.50	        128.20	  4.70	        Spodumene Rich Pegmatite

The Company is very pleased with what the initial drill program has shown. Once all assay data is received from the laboratory and geological reports are completed, Abaddon will be able to determine the size and quantity of a Phase 2 drill program for 2010.

David Busch, BA, BSc, PGeo, Vice President of Exploration, is the qualified person under the meaning of National Instrument 43-101 and has reviewed the data in this news release.

About Consolidated Abaddon Resources Inc.:
Consolidated Abaddon Resources is a lithium, rare earth and uranium exploration company developing properties in northern Ontario and the Athabasca Basin of northern Saskatchewan.

For further information on Consolidated Abaddon Resources Inc. (TSX-V: ABN), visit our Company's web site at www.consolidatedabaddon.com.

ON BEHALF OF THE BOARD OF DIRECTORS

"Don Huston"
____________________________
DONALD C. HUSTON
Director

For further information contact myself or:
Don Myers
Consolidated Abaddon Resources Inc.
Director
Telephone: 604-687-3376
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@consolidatedabaddon.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

This news release may contain certain "Forward-Looking Statements" that may involve a number of risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. For a more detailed discussion of such risks and other factors, refer to the Company's filings with Canadian Securities regulators available on www.sedar.com.
 
#Fri Mar 5, 2010
Consolidated Abaddon Issues Shares to Rubicon

 Vancouver, BC - Consolidated Abaddon Resources Inc. (TSX-V: ABN) (FWB: E2L) (the "Company") announces that further to the Company's news release of February 10, 2010, the Company has issued 100,000 common shares and paid the sum of $5,000 to Rubicon Minerals Corp. (TSX: RMX) in connection with its termination of the option acquire the White River Property (also referred to as the Pukaskwa property) located in the Sault Ste. Marie Mining District Ontario.

The common shares issued are subject to a four month hold period under applicable securities laws, and imposed by the TSX Venture Exchange, expiring June 27, 2010.

About Consolidated Abaddon Resources Inc.:
Consolidated Abaddon Resources Inc. is a Canadian exploration company actively involved with the development of rare earth, lithium and uranium properties in northwestern Ontario and in the Athabasca Basin of northern Saskatchewan.

For further information on Consolidated Abaddon Resources Inc. (TSX-V: ABN), visit our Company's web site at www.consolidatedabaddon.com.

ON BEHALF OF THE BOARD OF DIRECTORS

"Don Huston"
____________________________
DONALD C. HUSTON
Director

For further information contact myself or:
Don Myers
Consolidated Abaddon Resources Inc.
Director
Telephone: 604-687-3376
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@consolidatedabaddon.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.
 
#Fri Feb 12, 2010
Consolidated Abaddon Drill Program Begins on Raleigh Lake Lithium Project

 Vancouver, BC - Consolidated Abaddon Resources Inc. (TSX-V: ABN) (FWB: E2L) (the "Company") announces that its winter phase one 2010 drill program has commenced on its Raleigh Lake Lithium project located in the Kenora Mining Division, Northwestern Ontario.

Raleigh Lake Lithium project location map:
http://www.consolidatedabaddon.com/s/Image.asp?i=maps/Ignace.jpg

The Raleigh Lake Lithium property is ideally located 5 km south of the Trans Canada Highway between the towns of Dryden and Ignace, Ontario. Accessibility to the property is also readily available with infrastructure and power nearby.

A phase one drill program consisting of 6 holes totalling approximately 1400 metres is being carried out by Rodren Drilling of Winnipeg, Manitoba.

Raleigh Lake Lithium proposed 2010 drill holes:
http://www.consolidatedabaddon.com/s/Image.asp?i=maps/2010_Raleigh_Lake_Proposed_Holes.jpg

A detailed magnetometer survey was completed across the entire Raleigh Lake Lithium property in November 2009. Structural interpretations from the magnetic data were used in the targeting of the phase one 2010 drill holes on the property.

Only a few shallow holes were drilled on the Raleigh Lake property by Avalon Ventures Ltd. in 1999 and 2000. Historic data available in the Ontario Government geological files reflect certain significant intersections below.

Hole # RL 99-01 0.56 % Li (lithium) over 3.2 metres
Hole # RL 99-04 1.00 % Li over 4.1 metres
Hole # RL 99-05 1.50 % Li over 6.9 metres

Lithium and Tantalum on the Raleigh Lake property are associated with a shallow dipping pegmatite system that crosscut mafic volcanic rocks. These volcanic rocks flank granitic intrusives. The structural elements from the magnetometer survey identified structural areas where "ground preparation" may have lead to thicker and more prospective sections of pegmatite. Several rock geochemical anomalies are aligned with interpreted structures in the general area of previous intercepts and will be further tested.

The Raleigh Lake Lithium-bearing pegmatites have been known in the area since the 1960s. Ontario Provincial Government mapping in the 1990s identified a pegmatite field trending through the area. A very modest drill program conducted by Avalon Ventures Ltd. in 1999 and 2000 defined several stacked shallow dipping (20 to 30 degrees) lithium bearing dikes in several drill holes. Thicknesses ranged from one to eight metres and were shown to continue 450 metres down dip. Drill holes were relatively shallow and broadly spaced. The pegmatites appear very uniform at the spacing used and occur in volcanic rock flanking granitic intrusions.

Consolidated Abaddon has approximately $2.3 million in its treasury and no debt.

David Busch, BA, BSc, PGeo, is the qualified person under the meaning of National Instrument 43-101 and has reviewed the data in this news release.

About Consolidated Abaddon Resources Inc.:
Consolidated Abaddon Resources Inc. is a Canadian exploration company actively involved with the development of uranium and lithium properties in the Athabasca Basin of northern Saskatchewan and in northwestern Ontario.

For further information on Consolidated Abaddon Resources Inc. (TSX-V: ABN), visit our Company's web site at www.consolidatedabaddon.com.

ON BEHALF OF THE BOARD OF DIRECTORS

"Jim Pettit"
____________________________
JAMES G. PETTIT
President

For further information contact myself or:
Don Myers
Consolidated Abaddon Resources Inc.
Director
Telephone: 604-687-3376
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@consolidatedabaddon.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

This news release may contain certain "Forward-Looking Statements" that may involve a number of risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. For a more detailed discussion of such risks and other factors, refer to the Company's filings with Canadian Securities regulators available on www.sedar.com.
 

Copyright © 2010 by Consolidated Abaddon Resources Inc.   All rights reserved worldwide.
For more information, send questions and comments to
This page was created on Wed Sep 8, 2010 at 4:41:06 AM Pacific Time.